Binatone FM-4400 Installation Manual Page 13

  • Download
  • Add to my manuals
  • Print
  • Page
    / 23
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 12
Assembly
Sec. 3 Pg. 9
Step Procedure
Front Bumper
8.1 Attach Bumper [22] to Frame Weldment [12]. Fasteners: (4 ea.) Screws, self drilling
self tapping #12 x 7/8".
Step Procedure
Mooring Tube
Fig. H
7.1 Determine the location of the Mooring Tube Assembly:
FM 4400 - the rear Cross Channel [11] is preferred, the center Cross Channel is
optional.
FM 6600 - the center Cross Channel [11] is mandatory.
7.2 Attach Mooring Pipe Clamp [18] to Cross Channel [11]. Fasteners: (4 ea.) 1/2” x 1-
1/2” bolt, nut & lockwasher. Tighten these bolts at this time.
7.3 Insert short end of Mooring Pipe [19] into Mooring Pipe Clamp [18].
Adjustment: The distance from the center of the hoist to the inboard side of the
Mooring Pipe [19] should equal 1/2 of the boat’s beam plus 1 to 2 inches.
7.4 With the Mooring Pipe [19] properly positioned and vertical, tighten the bolts on the
Mooring Pipe Clamp [18]. Fasteners: (3 ea.) 1/2” x 2" bolt, nut & lockwasher.
Fig. H
HydroHoist Marine Group
Model: 4400/6600/ UL2FM
Publication: 10/14/08
Page view 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 22 23

Comments to this Manuals

No comments